Agenda Constructiilor
Marti, 16 Decembrie 2025
ABONARE REVISTE
Home - Stiri - English Section - CONSULTANCY: Planning, designing and constructing metallic structures
CONSULTANCY: Planning, designing and constructing metallic structures
English Section Publicat de Ovidiu Stefanescu 31 Aug 2015 12:12
The elevation of structural steelwork consists of the assembly of steel components into a frame on site. The processes involve lifting and placing components into position, then connecting them together. Generally this is achieved through bolting, but sometimes the site welding is used. The assembled frame needs to be aligned before bolting up is completed, and the structure have to be handed over to the principal contractor. To achieve the client's aspirations on cost and quality, planning the construction should start at the very beginning of the design process. Such planning should consider the construction sequence, the design factors that affect "buildability" and site practice in terms of typical elevation plant. Choosing simply-assembled connections will affect the ability to use site welding. One of the key parameters when planning for elevation is the piece-count. The number of pieces elevated is dependent on the choice of crane, and its availability for steel elevation rather than other construction activity. Cranes vary in their rapidity of movement (hook travel, slewing and jibbing out), and their overall productivity can also be influenced by a wise choice of location within the site footprint. Rates of elevation are also influenced by whether special rigging methods and devices can be used for slinging and release of loads. As for lining, leveling and plumbing, these activities consists of an interaction between the site engineer using the survey instrument and the elevation team doing the final bolt tightening and shimming. By the progressive use of wedges, jacks, pull-lifts and proprietary pulling devices the elevation team persuades the frame to move to a position acceptable to the checking engineer and then bolts it up firmly. Tolerances on frame and member geometry are specified in order to ensure that the "as built" frame geometry complies with the designer’s assumptions. The final objective of the process is to handover the frame to following trades in an acceptable condition.
 
Agenda Investitiilor
ABONARE REVISTA (click aici):  PROIECTE | INVESTITII | REVISTE | INDEX COMPANII
DATE DE CONTACT: Agenda Constructiilor & Fereastra - Tel/Fax: 021-336.04.16, 031-401.63.88
 
BIMTotalEnergiesALLBIMhilti
ROCKWOOL 196
Editia
NOIEMBRIE/DECEMBRIE 2025!
- pe site -
Revista Agenda Constructiilor editia nr.195 (Noiembrie-Decembrie 2025)
 

Autentificare

romania fara hospice
GHID de INSTALARE
CDS
MAKITA
SIGM
KADRA
Daikin
EDIT-Structural
quadratum
Acvatot 2019
BogArt
EURO BUILD
ELECTROGRUP
CONCEPT STRUCTURE
leviatan
ERBASU CONSTRUCT
DRS
strabag nivel 1
Daikin
concelex
Ubitech
MCA
TECNIC
theda mar
AED
GEWISS
Arduro
Eco Garden Construct
noark

Parteneri

HABITAT
ahkawards
FPSC_2019
 

Tamplarie aluminiu Termopan Salamander Pereti cortină Tâmplărie din aluminiu urmarirea comportarii in timp a constructiilor